Deliverables and Milestones of the project (by chronological order)

 

  • Deliverable 1.1: Detailed work program - project master Doc.

  • MS 19: Nomination of the ethics environment committee

  • Deliverable D2.6: Analysis and definition of objectives 

  • Deliverable D 1.7 : Report of environmental recommendations

  • Deliverable D 3.1: Report Thermo-physical, Chemical and Mechanical characterization of the different considered FSMs

  • Deliverable D 3.2: Thermo-physical and chemical characterization of different ternary and quaternary molten salt mixtures

  • Deliverable D 9.1: Dissemination and exploitation plan

  • Deliverable D 3.3: Durability and compatibility analysis between HSM and HTF 

  • Deliverable D 3.6: Validation HSM employed building of pilot plant 

  • Deliverable D 4.1: Design, realization and commissioning of the trial TES prototypes 

  • MS 3: Tests regarding the durability of the FSMs under hot oil and molten salt mixtures completed

  • MS 5: Characterization of thermal fluid dynamics properties of new nitrate salt mixture used for thermal energy storage

  • MS18: Selection of the subcontractors specialized in RES risk assessment and management

  • Deliverable D2.1: Modeling and validation of the two TES options

  • Deliverable D2.5: Study on thermal storage modelling for the CSP-ORC control logic definition

  • Deliverable D 4.5: Study on thermal storagfe modeling for the CSP-ORC interface between Thermal storage and ORC

  • Deliverable D 5.1: Integrated design completed

  • Deliverable D 7.1: Public acceptance 

  • Deliverable D  2.2:Operations strategies for the two TES options

  • Deliverable D2.3: The operation controller will be tested and optimized for output based on the simulation models developed in 2.1

  • Deliverable D 3.4: Compatibility test between oil and molten salts mixtures 

  • Deliverable D 3.5: Report on corrosion tests of different CS and SS in ternary and quaternary molten salt mixture at medium temp 340°C

  • MS 1: Operations strategies for the two TES options available

  • MS 4: Definition of the best combination storage material/HTF/container material

  • MS 6: Realization of the TES prototypes

  • MS 2: Suggestion on TES solution to be used in the demonstration plant

  • Deliverable D2.4: Techno-economic CSP plant optimization with the thermal storage tank 

  • Deliverable D 1.2: Periodic Report 1 (Mid-term Report)

  • Deliverable D 1.5: First revision of Project Master Document (D1.1)

  • Deliverable D 4.2: Validation of the trial TES systems

  • Deliverable 4.3: Assessment, evaluation of results and feedback on trial modelling 

  • Deliverable 9.2: ORC-PLUS IPR Protection plan

  • MS 7: TES prototype model validation

  • Deliverable 4.4: Report on CSP performance analysis without TES with TES molten salt and with FSM/oil

  • Deliverable 8.3: Workshop on Technology risk identification

  • Deliverable 8.1: Technology Risk identification applied to the ORC-PLUS Project

  • Deliverable 9.3: One mid term report Mid-term report on communication activities 

  • Deliverable1.8: Revision of Report of environmental recommendations

  • Deliverable 8.4: Workshop on mitigation risk

  • Deliverable 5.2: Design, erection & commissioning solar field 

  • Deliverable 9.5: Revision of  Dissemination and exploitation 

  • MS 8: Completion of civil works for thermal storage and hydraulics and electric connection pilot plant

  • Deliverable 5.3: Design, erection & commissioning Storage system 

  • MS 16: Solar field commissioning

  • Deliverable 1.3: Periodic Report 2

  • Deliverable 1.6: Second revision of the project master Document (D1.1)

  • Deliverable D5.4: Commissioning of plant integration

  • Deliverable 6.1: Testing strategy definition Approved testing strategy and planning

  • Deliverable 7.2: LCA (life cycle assessment) report

  • MS 11: Plant decommissioning and recycling assessment

  • Deliverable 8.2: Technology Risk Management plan

  • MS 13: Promotion of the risk plan to stakeholders

  • MS 12: Signature of a risk ownership agreement

  • Deliverable D7.3 Report on Supply side issue

  • Deliverable D 7.4: Report on Demand side issues

  • Deliverable D 9.4: final report on communication activities related impacts on explotation

  • MS 15: Routes proposed for further exploitation

  • Deliverable D 1.4: Technical and Scientific Monitoring (TSM)  FINAL REPORT

  • Deliverable 6.2: Plant performance monitoring

  • Deliverable 6.3: Performance analysis

  • Deliverable 6.4: System approval for industrial scale Concluding report on feasibility 

  • Deliverable 6.5: Test the preindustrial scale pilot performances and reliability under real life context

  • Deliverable 7.5: Final report on on Businness Case

  • MS 9: Pre-industrial scale system approved

  • MS 10: Final criteria for partner search and list of identified strategic partners

  • MS 17: Approved simulation model

Deliverables