Deliverables and Milestones of the project (by chronological order)
-
Deliverable 1.1: Detailed work program - project master Doc.
-
MS 19: Nomination of the ethics environment committee
-
Deliverable D2.6: Analysis and definition of objectives
-
Deliverable D 1.7 : Report of environmental recommendations
-
Deliverable D 3.1: Report Thermo-physical, Chemical and Mechanical characterization of the different considered FSMs
-
Deliverable D 3.2: Thermo-physical and chemical characterization of different ternary and quaternary molten salt mixtures
-
Deliverable D 9.1: Dissemination and exploitation plan
-
Deliverable D 3.3: Durability and compatibility analysis between HSM and HTF
-
Deliverable D 3.6: Validation HSM employed building of pilot plant
-
Deliverable D 4.1: Design, realization and commissioning of the trial TES prototypes
-
MS 3: Tests regarding the durability of the FSMs under hot oil and molten salt mixtures completed
-
MS 5: Characterization of thermal fluid dynamics properties of new nitrate salt mixture used for thermal energy storage
-
MS18: Selection of the subcontractors specialized in RES risk assessment and management
-
Deliverable D2.1: Modeling and validation of the two TES options
-
Deliverable D2.5: Study on thermal storage modelling for the CSP-ORC control logic definition
-
Deliverable D 4.5: Study on thermal storagfe modeling for the CSP-ORC interface between Thermal storage and ORC
-
Deliverable D 5.1: Integrated design completed
-
Deliverable D 7.1: Public acceptance
-
Deliverable D 2.2:Operations strategies for the two TES options
-
Deliverable D2.3: The operation controller will be tested and optimized for output based on the simulation models developed in 2.1
-
Deliverable D 3.4: Compatibility test between oil and molten salts mixtures
-
Deliverable D 3.5: Report on corrosion tests of different CS and SS in ternary and quaternary molten salt mixture at medium temp 340°C
-
MS 1: Operations strategies for the two TES options available
-
MS 4: Definition of the best combination storage material/HTF/container material
-
MS 6: Realization of the TES prototypes
-
MS 2: Suggestion on TES solution to be used in the demonstration plant
-
Deliverable D2.4: Techno-economic CSP plant optimization with the thermal storage tank
-
Deliverable D 1.2: Periodic Report 1 (Mid-term Report)
-
Deliverable D 1.5: First revision of Project Master Document (D1.1)
-
Deliverable D 4.2: Validation of the trial TES systems
-
Deliverable 4.3: Assessment, evaluation of results and feedback on trial modelling
-
Deliverable 9.2: ORC-PLUS IPR Protection plan
-
MS 7: TES prototype model validation
-
Deliverable 4.4: Report on CSP performance analysis without TES with TES molten salt and with FSM/oil
-
Deliverable 8.3: Workshop on Technology risk identification
-
Deliverable 8.1: Technology Risk identification applied to the ORC-PLUS Project
-
Deliverable 9.3: One mid term report Mid-term report on communication activities
-
Deliverable1.8: Revision of Report of environmental recommendations
-
Deliverable 8.4: Workshop on mitigation risk
-
Deliverable 5.2: Design, erection & commissioning solar field
-
Deliverable 9.5: Revision of Dissemination and exploitation
-
MS 8: Completion of civil works for thermal storage and hydraulics and electric connection pilot plant
-
Deliverable 5.3: Design, erection & commissioning Storage system
-
MS 16: Solar field commissioning
-
Deliverable 1.3: Periodic Report 2
-
Deliverable 1.6: Second revision of the project master Document (D1.1)
-
Deliverable D5.4: Commissioning of plant integration
-
Deliverable 6.1: Testing strategy definition Approved testing strategy and planning
-
Deliverable 7.2: LCA (life cycle assessment) report
-
MS 11: Plant decommissioning and recycling assessment
-
Deliverable 8.2: Technology Risk Management plan
-
MS 13: Promotion of the risk plan to stakeholders
-
MS 12: Signature of a risk ownership agreement
-
Deliverable D7.3 Report on Supply side issue
-
Deliverable D 7.4: Report on Demand side issues
-
Deliverable D 9.4: final report on communication activities related impacts on explotation
-
MS 15: Routes proposed for further exploitation
-
Deliverable D 1.4: Technical and Scientific Monitoring (TSM) FINAL REPORT
-
Deliverable 6.2: Plant performance monitoring
-
Deliverable 6.3: Performance analysis
-
Deliverable 6.4: System approval for industrial scale Concluding report on feasibility
-
Deliverable 6.5: Test the preindustrial scale pilot performances and reliability under real life context
-
Deliverable 7.5: Final report on on Businness Case
-
MS 9: Pre-industrial scale system approved
-
MS 10: Final criteria for partner search and list of identified strategic partners
-
MS 17: Approved simulation model